BONDERITE® S-FN 310 is a powerful dry-film solution for long term protection in a wide range of applications. BONDERITE® S-FN 310 is provided as a two-part system, that is mixed upon time of application – slowly add component “A” to component “B” with continuous stirring for homogeneity.
The mixed BONDERITE® S-FN 310 solution is then sprayed onto the surface in a thickness between 0.2 - 0.7 mils, or 4 – 6 passes with the spray nozzle. The shelf life of the prepared mixture is 24 hours.
Once the coating is applied, allow the surface to dry (5-10 minutes) before loading into curing oven. The most popular curing cycles and temperatures based on an average coating of 0.0003 inch and are listed below:
- 60 minutes at 300°F (149°C)
- 10 minutes at 350°F (177°C)
- 8 minutes at 400°F (204°C)
- 4 minutes at 500°F (149°C)